MASONS SUPPLY COMPANY

Oregon (800) 537-3407 ♦ Washington (800) 537-6216

Clackamas | Eugene | West Eugene | Hillsboro | Medford | Portland | Salem | Wilsonville | Ridgefield | Seattle | Tacoma | Woodinville

M A S C O . N E T

GENERAL & TECH INFO

GLOSSARY OF TERMINOLOGY

LINER

Any sheet or layer of material attached directly

to the inside face of the forms to improve

surface quality, alter the texture, or to imprint

specific architectural patterns on the finished

concrete.

LIVE LOAD

The total weight of workers, equipment, buggies,

vibrators and other loads that will exist and move

about due to the method of placement, leveling

and screeding of the concrete pour.

LOAD EQUALIZERS

A system of equalizing sheaves designed to

distribute the load equally to each form lift point

when multiple-leg slings are used to lift a form.

MODULAR FORMWORK

Prefabricated all-metal or metal-supported-

plywood systems in standard sizes with an

integral provision for tie and connecting

hardware.

MONOLITHIC

Concrete placement technique in which the

slab, the beams, the columns, and the walls or

any combination of the above elements

are poured at the same time.

MUDSILL

A plank, or concrete slab, on the ground, to

provide a level surface and support to concrete

forms.

MULTI-LIFT

The vertical stacking of forms in tiers for any

height wall. A wall requiring more than one row

of forms is generally referred to as multilift.

NAILER

Strip of wood or other material attached

to or set in concrete or attached to steel to

facilitate making nailed connections.

OFFSET

A displacement or abrupt change in line or the

distance between two parallel lines; such as a

change in wall thickness which will create

a vertical offset.

ONE-SIDED

A wall formwork system having only one forming

FORMWORK

side, requiring special provisions for tieing and

support. Commonly required when placing

concrete against sheet pile, slurry walls, soldier

beam embankments, and existing concrete or

concrete block walls.

PANEL

A section of form sheathing constructed from

boards, plywood, metalsheets, etc., that

can be erected and stripped as a unit. Panels

can be built on jobsite or prefabricated factory

built.

PAN-JOIST

A light slab with ribs normally 24 to 36 inches

on center acting as beams. The joists or ribs run

at right angles to primary beams or girders.

PARAPET

Part of a wall that extends above the roof level.

PENCIL ROD

Metal rod (wire), usually about ¼" diameter,

used in conjunction with special bearing clamps

to perform as a wall form tie.

PENETRATION

Any concrete embedment device that must

pass through the form face (such as anchor

bolts, rebar, or dowel rods).

PERMANENT FORM

Any form that remains in place after the

concrete has developed its design strength. The

form may or may not become an integral part

of the structure.

PILASTER

Column built with a wall, usually projecting

beyond the wall face.

PLATE

A flat horizontal member such as a 2 x 4 placed

on the footing for leveling and upon which the

forms are set, sometimes referred to as a “shoe.”

PLUMB

Vertical or the act of making vertical.

POST-TENSIONED

Reinforced concrete in which, after the

CONCRETE

concrete has set and sufficiently hardened, the

desirable distribution of stress is achieved by post

tensioning steel tendons, bars or wires.

PRECAST CONCRETE

Concrete units (such as beams, joists, deck

panels, or wall panels) cast elsewhere than

its final position and then set in place.

PRESTRESSED

A system for utilizing the compressive strength of

CONCRETE

concrete by producing required compressive

stresses with highly stressed tension rods, tendons

or wires.

REBAR

Abbreviation for “Reinforcing Bar.”

RETAINING WALL

A wall, which is designed to resist horizontal

loads such as those imposed by soil or water.

RIBS

Parallel structural members backing sheathing in

a prefabricated form. Same as crossmembers.

RIGGING

Suspension components, such as chains,

shackles, connecting links and eye hooks

used to suspend formwork gangs or components

from a crane or similar lifting device.

RUSTIFICATION

A groove in the concrete formed by securing a

strip to the face of the formwork. Also referred to

as a “feature strip.”

SAFETY FACTOR

See Factor of Safety.

SCAB

A small piece of wood fastened to two formwork

members to secure a butt joint.

SCAFFOLD BRACKET

A premanufactured cantilevered bracket

designed to attach to formwork gangs and

support scaffold planks that are used for a work

platform when placing and vibrating concrete.

SCAFFOLDING

An elevated platform supporting workers, tools,

and materials, either attached to wall forms or

free standing.

SCREED

The tool used to control the top surface

elevation of freshly placed concrete.

SHEATHING

The material forming the contact face of forms,

also called lagging or sheeting.

SHE-BOLT

The outer unit of a three-piece wall tie that

contains female threads to engage the

external threaded inner unit (rod). SHIM

Thin pieces of material used to bring abutting

members to an even, level bearing.

SIDERAIL

Perimeter frame member of prefab form panel

which is perpendicular to crossmembers.

SILL

Horizontal bearing member as a plate.

See Plate.

SKIN PLATE

The steel form face of an all-steel form brace.