62
MASONS SUPPLY COMPANY
Oregon (800) 537-3407 ♦ Washington (800) 537-6216
Clackamas | Eugene | West Eugene | Hillsboro | Medford | Portland | Salem | Wilsonville | Ridgefield | Seattle | Tacoma | Woodinville
M A S C O . N E T
- Repeat Steps 1 & 2 to make a second pair of legs with the Frame attached.
- Tilt up the U-shaped legs with 3 frames.
- Tilt up the other pair of legs with one frame and bring them to the
U-shaped tower.
- Connect the frames to the legs making sure to check the 15"
dimension from the Iflon washers.
- Check the plumbness of the legs by adjusting the Screw Jacks
as required.
STEP 4
STEP 5
STEP 6
HORIZ. FORMING & SHORING
MEGA SHORE




