61
MASONS SUPPLY COMPANY
Oregon (800) 537-3407 ♦ Washington (800) 537-6216
Clackamas | Eugene | West Eugene | Hillsboro | Medford | Portland | Salem | Wilsonville | Ridgefield | Seattle | Tacoma | Woodinville
M A S C O . N E T
- Place a Jack Leg on the ground.
- Measure the Screw Jack extension.
- Mark the leg 15" from the Iflon washer (to locate frame).
- Attach the frame to the top slot on the Jack Leg.
- Fasten the middle frame wing nut snug, but not too tight.
- Check the frame location against the mark on the leg.
- Fasten the other two frame wing nuts, then tighten all three.
- Rotate the leg attached frame to lay flat on the ground.
- Take the second leg and measure the Screw Jack extension.
- Mark the leg 15" from the Iflon washer.
- Attach the frame to the second leg as in Step 1.
- Attach two Frames (one to each leg) so that the Frames are vertical.
STEP 1
STEP 2
STEP 3
HORIZ. FORMING & SHORING
MEGA SHORE